"Sky Building"
A complete design of a mixed-use building with a martial arts hall, located in Meden Rudnik residential district, Burgas, with a total built-up area of 40,000 sq.m.
The building is divided into two bodies - Body 1 and Body 2 - structurally independent but functionally connected. Within the regulated land plot, a two-level underground car park is provided, with access from two-lane and one-lane ramps, as well as a partial third level with access via a ramp from the adjacent street.
There is an aparthotel, a residential area, a sports hall and a ground level with public service functions - shops, a bakery, children's centre and a fast-food restaurant. In the residential part, there are 276 flats of various layouts - predominantly two- and three-room flats, and in the hotel part there are 104 flats.
Approximately 300 parking spaces are provided within the property, out of below 280 required under Ordinance No. 02.
All requirements for accessibility for disabled people have been met. The design includes the required flats with suitable equipment as well as the necessary parking spaces of the respective sizes.
A fire extinguishing system is provided on the underground level. All the evacuation and fire protection requirements of the current regulations of the 'Fire Safety and Protection of the Population' General Directorate are complied with.
The finishing works on the façades will be done with plaster; the volumes will be partially assembled with decorative elements. The roof of the sports hall will be a metal-and-glass construction with a headroom of 6 m.
The designs were submitted to the Investor in June 2018, and construction is expected to begin in the coming months.